How to Bid in Construction Projects

March 14, 2024

The bidding process in construction projects can seem intimidating for new contractors. However, by reading RFBs thoroughly, calculating precise estimates and preparing thorough bid documents, it is possible to increase your chances of winning lucrative contracts.

The first step of the bidding process is usually the project owner announcing a project and providing basic information like scope, location and timeline. Detailed bid documents are then made available to interested parties. These documents typically include plans and specifications, a schedule for completing the work, itemized costs, a profit margin, and contract terms. The project owner then reviews all bids and selects a contractor for the job. In some cases, the decision may be based on price alone, but other times project owners consider things like contractor experience, scheduling philosophy and safety records when making their choice.

After the project has been awarded to a contractor, the contractor and project owner will form a construction contract that both parties will sign. Contracts can be a fixed-price, time and materials or an integrated project delivery (IPD) method. The type of contract will depend on the project owner’s preference and the requirements set out in the plans and specifications.

The final step is identifying and mitigating risks that could impact the completion of the project. This can be done by analyzing risk tolerance levels, conducting accurate takeoffs, visiting the site in person, double-checking numbers, establishing equipment requirements, verifying building material specifications and completing a comprehensive risk assessment.

Mission

Traffic Dave is on a mission to help traffic engineers, transportation planners, and other transportation professionals improve our world.
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram